Chernobyl Document \"Working Design\" Power Units 5 and 6 of the Chernobyl Nuclear Power Plant
The Working Design folder for the bridge over the tailrace for supplying construction materials to Power Units 5 and 6 of the Chernobyl Nuclear Power Plant (supports) is presented.
\"Ukrainian State Institute for Road Design.
The folder contains drawings
and two checkbooks.
Number of drawings: 15.
1. Concrete joints UM1 and UM2
2. Retaining wall concreting joints, reinforcement diagram
3. Specification. Retaining wall block, mesh S-2
4. Specification. Cabinet walls BSH1, BSH2, BSH3, mesh S-1
5. Abutment element arrangement diagram
6. Reinforcement pattern
7. Specification, mesh S-1 concreting joint
8. Specification: Concrete joint UM-1, mesh S-2
9. Cabinet wall BSH-1, BSH-2 reinforcement diagram
10. Reinforcement of subtrusses of coastal supports
11. Retaining wall block reinforcement diagram
12. Transition slab P-4 reinforcement diagram
13. Retaining wall block mesh S-1
14. Retaining wall monolithing units UM 6..9 bldg1.
15. Retaining wall block.